Conception of ChemPark Tagil

Being a leader in the industry we are dutiful to nature and society. Every day we make chemical production cleaner and safer.

«Uralchimplast», a leading Russian producer of synthetic resins and plastics, executes an investment project Chemical Park «Tagil». The project is attractive for Russian and foreign partners as a turnkey infrastructure solution for the quick start of chemical or related production business.

Chemical Park «Tagil» is a specialized chemical site, located in the industrial region of the Urals, its choice is determined by presence of rich raw materials base, available petrochemicals, energy and human resources, as well as by proximity to numerous and various market channels: metallurgy, machine building, petrochemistry, oil and gas recovery, industry of construction materials,  woodworking etc.

Total area of the Park is 140 ha. Investors are offered facilities, equipped with required utility lines. Free capacities of utilities are available: electric power, water, gas, compressed air, steam, nitrogen. Rainfall and fecal effluent discharge to the own treatment facilities is organized in the territory of the Park. There are furnaces of thermal neutralization for recovery of chemical contaminated runoff, and a landfill for solid wastes. Besides, ChemPark «Tagil» is an extensive network of railway lines, automobile roads, storage facilities, utilities system in the territory.

Additionally the Managing Company renders the whole range of services: designing and engineering, equipment and automation systems maintenance, land improvement and patrolling, raw material and end product storage. As well as services of mechanical-repair department, accredited lab, customs, logistical-type, legal, marketing services, assistance in communication with local and regional authorities. 

Advantages of business development inside ChemPark:

– significant (up to 50%) economy of investment expenses for infrastructure development;

– quick project kick-off (already in 2-3 months), and reduction of its pay-back period;

– reduction of policy and infrastructure risks;

– competitive growth due to unified raw, haul and power-generation cycle time, flexible staff workload and outsourcing.

The project is realized with support of the Sverdlovsk region government and the RF government; providing the residents with certain privileges is planned.

Ask question

Your question (write your e-mail, please) Theme select

Location